Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the canvas domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/kamasuka/public_html/louisvillenewsjournal.com/wp-includes/functions.php on line 6131

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the powerkit domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/kamasuka/public_html/louisvillenewsjournal.com/wp-includes/functions.php on line 6131

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the wpforms-lite domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/kamasuka/public_html/louisvillenewsjournal.com/wp-includes/functions.php on line 6131

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the wordpress-seo domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/kamasuka/public_html/louisvillenewsjournal.com/wp-includes/functions.php on line 6131
The Louisville Metro Air Pollution Control District proposes to issue a construction permit for GE Appliances in accordance with Regulation 2.03 - Louisville News Journal
Notice: Function WP_Scripts::add was called incorrectly. The script with the handle "powerkit" was enqueued with dependencies that are not registered: tippy. Please see Debugging in WordPress for more information. (This message was added in version 6.9.1.) in /home/kamasuka/public_html/louisvillenewsjournal.com/wp-includes/functions.php on line 6131

The Louisville Metro Air Pollution Control District proposes to issue a construction permit for GE Appliances in accordance with Regulation 2.03

Louisville, KY – City officials have announced that the 30-day public comment period starts August 18, 2022, and ends on September 16, 2022.

A public hearing may be scheduled if the District determines that there are germane, unresolved issues or substantial public interest, in accordance with Regulation 2.07.

Drafts of the permit and summary are available at the District office, 701 West Ormsby Avenue, Suite 303, Louisville, KY 40203, between 8:00 a.m. and 5:00 p.m., Monday through Friday, by calling Matt King at (502) 574-6000, emailing our permitting department, or on the APCD website.

Copies of the application are available upon request. Written comments will be accepted through our online comment form until midnight or at the District office until 5:00 p.m. on September 16, 2022.

This construction project is to install a new stainless-steel dryer drum fabrication line and revise the Best Available Control Technology requirements for two existing stainless-steel dryer drum fabrication lines.

Total
0
Shares
2 comments
Leave a Reply

Your email address will not be published. Required fields are marked *

Previous Article

LMPD’s First Division responded to a report of a suspicious package downtown on 5th Street near Jefferson and Market

Next Article

LMPHW is asking the community to take precautions if they encounter a bat after an infected bat was discovered at a residence located in the 40299 ZIP code

Related Posts